For scaffolds that measure four times taller than their base, use guying, bracing or tying to hold it steady and keep it from falling. Have a ladder to reach the highest platform available and a lift system for hoisting tools and equipment up to the scaffolding. All other sides need guardrails and toe boards. The working deck front side cannot sit more than 14 inches from the surface. Check the locking devices each time you verify the wheel locks.įor the platforms, do not allow more than a one-inch gap between boards. Pin each layer and double-check the security of the pin connections to ensure they each are in place. Always install cross-bracing at each layer and lock the connections into place. Erect Parts to Specificationsīuild the scaffolding according to specifications for the type used. Check that all wheels remain locked before anyone climbs onto the scaffolding. If the scaffolding has wheels on the base for easy moving, lock them after moving the structure into place. Square footings ensure the scaffolding has not twisted. Also, check the footings to ensure they are at right angles to each other. Use a level to verify the first layer of the scaffold does not have any slopes or dips. The first level is the most essential part of the scaffolding because it must hold the rest of the structure.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |